PHOTO GALLERY

This is a close up of the Google Earth image from 04.22.16 showing the North East corner of the quarry. Please note the green slime in the cell. The permit requires the spent lime sludge to be dried and mixed into a homogenous blend with 1 part dry spent lime sludge and 2 parts native soil. The photo suggests the spent lime sludge was dumped directly into a pit excavated to bedrock.
September 2016
|
Aerial Photography by OHAIR LLC.
|
October 2016
November 2016
December 2016
January 2017
February 2017
April 2017
June 2017
August 2017 (credit: Frankly Visual Photography)
September 2017 (Frankly Visual)
November 2017 (Frankly Visual)